Galfar Engineering and Contracting Company, one of Oman’s largest construction firms, has secured a major infrastructure project, winning the contract for the dualisation of the Adam-Thumrait road. The Ministry of Transport, Communications, and Information Technology (MTCIT) has awarded the contract to Galfar, with a total value of RO118 million. This win further solidifies Galfar’s stronghold in Oman’s infrastructure development and adds another high-value project to its growing portfolio.
Project Overview
The Adam-Thumrait road dualisation project is considered one of the most crucial infrastructure undertakings in Oman, aimed at improving connectivity between the northern and southern parts of the country. The road serves as a vital link for trade, travel, and logistics, connecting the interior regions to the southern governorates, including Dhofar. With heavy traffic movement, particularly from commercial vehicles, upgrading the existing road to a dual carriageway is expected to enhance road safety, reduce travel time, and boost economic activity.

Galfar’s awarded segment, referred to as Part 4, covers a 135-kilometer stretch from Muqshin to Duka. The project scope includes:
- Construction of 16 at-grade U-turns
- Development of dedicated service roads
- Establishment of three designated rest areas for travelers
- Provision of 25 lay-bys for temporary vehicle stops
- Installation of eight emergency median openings for enhanced safety
- Creation of 25 Royal Oman Police (ROP) parking zones
- Construction of approximately 241 reinforced concrete box culverts for cross drainage
- Implementation of 95 pipe culverts to support median drainage
- Development of median dykes and embankment protections
In addition to these, the project will involve reconstructing existing sections of the road where necessary, including areas prone to flooding. The removal of parts of the old roadway and the construction of new multi-cell box culverts at existing floodway locations will enhance the road’s durability and resistance to extreme weather conditions.
Contractual Details and Execution Timeline
Galfar received the official letter of award for the project on November 25, 2024. The total duration for completion has been set at 39 months, which includes both mobilisation and execution phases. The actual start date of the construction work will be determined soon, following initial preparatory activities.
Given the scale of the project, Galfar is expected to deploy a significant workforce and advanced construction equipment to ensure timely completion while maintaining high standards of quality and safety. The company’s extensive experience in executing large-scale road infrastructure projects places it in a strong position to handle this undertaking efficiently.
Strategic Importance of the Adam-Thumrait Road Project
The dualisation of the Adam-Thumrait road is a key component of Oman’s long-term infrastructure development strategy. As one of the country’s busiest highways, particularly serving logistics and commercial traffic, improving this corridor will have several strategic advantages:
- Enhanced Safety: The dual carriageway will significantly reduce the risk of accidents, particularly head-on collisions, which are a major concern on single-carriage roads.
- Economic Growth: Improved road infrastructure will facilitate trade by providing a smoother and more efficient transport route for goods moving between Oman’s northern and southern regions.
- Tourism Development: With easier access to Dhofar, a region known for its natural beauty and the famous Khareef season, the upgraded road will boost tourism and related economic activities.
- Logistics and Transport Efficiency: Faster travel times will reduce operational costs for businesses reliant on road transport, enhancing overall logistics efficiency.
- Job Creation: The construction and maintenance phases of the project will generate employment opportunities for local workers, further benefiting the economy.
Galfar’s Market Position and Strategic Growth
Securing this high-profile contract reinforces Galfar’s position as one of the leading engineering and contracting firms in Oman. With a robust portfolio spanning infrastructure, oil and gas, and construction, the company has consistently been at the forefront of the Sultanate’s development initiatives.
As of September 30, 2024, Galfar’s order book stood at an impressive RO890 million, reflecting its ability to secure major contracts across various sectors. The Adam-Thumrait road project adds further strength to its growing pipeline of infrastructure projects. The company’s expertise in executing road construction projects will be instrumental in ensuring the smooth delivery of this large-scale endeavor.
Galfar has also expressed its commitment to aligning with Oman Vision 2040, which aims to enhance infrastructure, technology, and transportation sectors through sustainable and strategic development projects. The company continues to explore additional opportunities, particularly in Public-Private Partnership (PPP) projects, which are expected to play a crucial role in Oman’s future infrastructure landscape.
Looking ahead, Galfar aims to diversify its portfolio further, tapping into new opportunities in education, healthcare, and emerging technology-driven infrastructure projects. The firm remains optimistic about its growth prospects and is strategically positioning itself to secure additional contracts that align with the nation’s long-term development goals.
Challenges and Expectations
While the Adam-Thumrait road project is a significant milestone, it is not without challenges. Given the harsh environmental conditions of the project area, including extreme temperatures and occasional flash floods, Galfar will need to implement advanced engineering solutions to ensure the road’s longevity and durability. The company’s ability to manage these challenges effectively will be crucial in meeting the project’s timeline and delivering a high-quality final product.
Additionally, factors such as rising material costs and logistical constraints could impact the overall execution of the project. However, with its extensive experience, resource management capabilities, and established supplier networks, Galfar is well-equipped to navigate these challenges successfully.
Conclusion
The awarding of the RO118 million contract to Galfar Engineering and Contracting for the dualisation of the Adam-Thumrait road marks a significant step forward in Oman’s infrastructure development. The project is expected to enhance regional connectivity, improve road safety, and support the nation’s economic and tourism sectors.
Galfar’s proven track record in executing large-scale infrastructure projects places it in a strong position to successfully complete this critical initiative within the stipulated timeframe. As Oman continues to invest in its transportation network, the Adam-Thumrait road dualisation project stands as a testament to the country’s commitment to progress and development.
With the construction set to commence soon, all eyes will be on Galfar as it embarks on yet another landmark project that will shape the future of Oman’s transportation sector.
Unveiling Oman’s Secrets: From Frankincense Trails to Golden Sands